Information on the Work Carried Out to Assess the Technical Condition of Watering Facilities
During the business trip to Pavlodar, Abai, and East Kazakhstan Regions from August 4 to 13, the staff of the Agricultural Water Supply Department carried out the following activities:
The methodology for field studies to assess the technical condition of watering facilities was coordinated with the Department of Agriculture of Pavlodar Region. Data were obtained on the structure of agricultural production, livestock numbers, and the availability of pasture areas in Pavlodar Region.
Field visits were conducted to Bayanaul, Maysky, and Akkuly districts of Pavlodar Region to assess the technical condition of water intake facilities intended for watering pastures. A total of 10 facilities were surveyed.
The methodology for field studies to assess the technical condition of watering facilities was coordinated with the Department of Agriculture of Abai Region. Data were obtained on the structure of agricultural production, livestock numbers, and the availability of pasture areas in Abai Region.
Field visits were conducted to Abai, Zharma, and Ayagoz districts of Abai Region to assess the technical condition of water intake facilities. A total of 14 facilities were surveyed.
The methodology for field studies to assess the technical condition of watering facilities was coordinated with the Department of Agriculture of East Kazakhstan Region. Data were obtained on the structure of agricultural production, livestock numbers, and the availability of pasture areas in East Kazakhstan Region.
A field visit was conducted to Zaysan, Kurshim, and Katon-Karagay districts of East Kazakhstan Region to assess the technical condition of water intake facilities. A total of 5 facilities were surveyed.